スイス
スイス

myGeobrugg

Ligne 500 000 de Chartres à Bordeaux- Déblai du tunnel de la Ramade

 - Ligne 500 000 de Chartres à Bordeaux- Déblai du tunnel de la Ramade 2024

The TECCO system combined with hydro mulching perfectly stabilizes the railway embankment and prevents further traffic disruption

 - Ligne 500 000 de Chartres à Bordeaux- Déblai du tunnel de la Ramade 2024

Landslides cut off traffic

 - Ligne 500 000 de Chartres à Bordeaux- Déblai du tunnel de la Ramade 2024

TECCO G45/2 mesh, in conjunction with nails, stabilizes the structure according to the dimensions specified

 - Ligne 500 000 de Chartres à Bordeaux- Déblai du tunnel de la Ramade 2024

A coco revegetation mat is laid under the TECCO to keep the fine soil particles until the surface vegetation recovers

 - Ligne 500 000 de Chartres à Bordeaux- Déblai du tunnel de la Ramade 2024

The hydro mulching operation is meticulously carried out to guarantee vegetation recovery

 

システム

 

設置年

2024

状況

The railroad line 500 000 arrives in the Bordeaux urban area at Lormont and enters underground at the northern end of the Ramade tunnel. Before this tunnel’s entrance, the profile is excavated, with up to 15 meters high embankments. These embankments are made up of silt and sandy clay, generating landslides and repeatedly cutting the tracks.

説明

TECCO was chosen as the optimum solution for this stabilization work. Dimensioning during the execution phase made optimizing the facing with a TECCO G45/2 possible, which greatly facilitated installation rates with a maximum cost/quality ratio for this project. The hydro mulching operation allowed the stabilization solution to be ideally finalized.

国名

フランス

顧客名

SNCF Réseau

エンジニアリング

SNCF Réseau

落札者

COFEX Géotechnique

下請

CAN

保護対象

鉄道

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

お問い合わせフォーム