Kaikoura State Highway (SR27) / Coastal Pacific Rail (NS15)

 - Kaikoura State Highway (SR27)   Coastal Pacific Rail (NS15) 2019

NS15: Looking North SH1 - 126 m SL-150 with transmission rope protecting the road and rail corridor

 - Kaikoura State Highway (SR27)   Coastal Pacific Rail (NS15) 2019

NS15: Looking South SH1 - 126 m SL-150 with transmission rope protecting the road and rail corridor

 - Kaikoura State Highway (SR27)   Coastal Pacific Rail (NS15) 2019

SR27: Looking North SH1 - SL-150 with transmission rope protecting the road and rail corridor

 - Kaikoura State Highway (SR27)   Coastal Pacific Rail (NS15) 2019

SR27: Looking South SH1 - SL-150 with transmission rope protecting the road and rail corridor

 - Kaikoura State Highway (SR27)   Coastal Pacific Rail (NS15) 2019

Note the Barrier is built on top of a culvert to contain the debris material in the event of overtopping

 - Kaikoura State Highway (SR27)   Coastal Pacific Rail (NS15) 2019

Slip 8, looking West and North SH1 - SL-150 protecting the road rail corridor

 

システム

 

システム延長

24 m - 126 m

 

設置年

2019

状況

The Kaikoura M7.8 Earthquake caused widespread damage to the road and rail corridor 20 km North and South of the Kaikoura township. Initially, more than 40 major slips inundated the road and rail with >750,000 m³ of material from source zones up to 500 metres above sea level. The loosened highly fractured Grey Wacke has caused subsequent frequent rockfalls, shallow landslides and debris loads.

The increased hazard associated with the frequent failures created a requirement to install shallow landslide barriers on several open slope locations to be able to maintain the SH1 road and Railway below. The major design constraint for the sites was minimising the deflection of the barrier in both rockfall and debris load events.

説明

The 3.5m high SL-150 barrier was selected due to its 150kN/m² load capacity with low defection (<2.2 metres in a debris load event) and due to it being the only tested and certified landslide barrier. To lower the deflection further for the maximum energy level (MEL) rockfall event, a custom transmission rope was designed and installed. The lower deflection was required due to the barriers close proximity to the railway.

To date, six SL-150s ranging from 24 metres to 126 metres long have been installed in the Kaikoura region with three of them having an additional transmission rope.

国名

ニュージーランド

顧客名

NCTIR / NZTA / KiwiRail

落札者

Geovert, SRG, HGS, Ground Anchor Systems and Geotech

保護対象

道路, 鉄道

腐食防止

ジェオブルッグ ウルトラコーティング

担当者の連絡先

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / アメリカ合衆国 Regional Manager Northeast

お問い合わせフォーム

Saleh Feidi
 

Saleh Feidi

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / アメリカ合衆国

お問い合わせフォーム

John Kalejta
 

John Kalejta

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,KS 67226 Wichita / アメリカ合衆国

お問い合わせフォーム

Bob Lyne
 

Bob Lyne

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / アメリカ合衆国

お問い合わせフォーム

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

お問い合わせフォーム

Tim Shevlin
 

Tim Shevlin

自然災害防護
Geobrugg North America, LLC,OR 97302 Salem / アメリカ合衆国

お問い合わせフォーム