スイス
スイス

myGeobrugg

 - Embalse Chironta 2023

Attenuator ATT-40 from the side, along the road

 - Embalse Chironta 2023

The rockfall protection attenuator seen from the road

 - Embalse Chironta 2023

Posts height of the attenuator protection system is eight meters

 - Embalse Chironta 2023

General view of system location

 

システム延長

75 m

 

設置年

2023

状況

Several rock cuts were made to construct this reservoir to obtain the necessary geometry for the reservoir and access roads. The generated slopes imply a challenge in terms of natural risks since they are mainly composed of fractured rock. It generated a series of low-energy and high-frequency landslides, which blocked the access roads, risking the operation of the reservoir.

説明

To solve these problems and mitigate risks on the most critical slopes, a rockfall attenuator (ATT-40) was installed. The attenuator mitigates low-energy rockfall from different small streams on the slope and guides them safely to the foot of the slope. In addition to the attenuator, a double curtain mesh (QUAROX, without picture) was installed in another sector of the reservoir’s access road.

顧客名

Dirección de obras Hidráulicas del Ministerio de Obras Públicas

保護対象

道路, インフラ

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス

お問い合わせフォーム