スイス
スイス

myGeobrugg

 - Coal Mine 2021

Completely installed rockfall barrier GBE-100A-R

 - Coal Mine 2021

Rainfall washed out the soil, causing rockfalls

 - Coal Mine 2021

Anchor of the barrier

 - Coal Mine 2021

Upper part of the rockfall protection fence

 - Coal Mine 2021

Inspection - 461 meters of rockfall fence were installed

 

システム

 

設置年

2021

状況

The mine has an impressive safety record and has won the group Chairman’s Safety Shield for its consistent improvement and the group CEO Safety Award for the best safety record of all group operations worldwide.
Required was a protection of the portal / entrance to the underground operation against rockfalls and masses of soil from erosion of the upper benches.

説明

It was decided to install GBE-100A-R rockfall barriers; height is 2 meters, total barrier length of the five barriers is 461 meters.

  • 1 GBE-100A-R, 77 m long
  • 2 GBE-100A-R, 108 m long
  • 3 GBE-100A-R, 24 m long
  • 4 GBE-100A-R, 120 m long
  • 5 GBE-100A-R, 132 m long 

国名

南アフリカ

顧客名

n.a.

落札者

保護対象

鉱山/採石場

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

お問い合わせフォーム

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

自然災害防護
Hydraulic Engineering
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス , Msc. Env. Eng.

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

お問い合わせフォーム