アメリカ合衆国
アメリカ合衆国

myGeobrugg

 - Bulli Pass (1) 2017

A 1,1 km long Shallow Landslide Barrier protects the road at Bulli Pass in New South Wales.

 - Bulli Pass (1) 2017

Placing concrete for post footings ©NSW Government

 - Bulli Pass (1) 2017

Overview of work site ©NSW Government

 - Bulli Pass (1) 2017

Site preparation ©NSW Government

 - Bulli Pass (1) 2017

Installation of barrier mesh fencing ©NSW Government

 - Bulli Pass (1) 2017

Work near satefy ramp ©NSW Government

 - Bulli Pass (1) 2017

Installed posts and footings ©NSW Government

 - Bulli Pass (1) 2017

Cranes lifting rock fall protection barrier components into position above Bulli Pass ©NSW Government

 - Bulli Pass (1) 2017

Precast concrete pad footings for the rockfall protection barrier posts ©NSW Government

 - Bulli Pass (1) 2017

Rear side of the barrier with brakes

 
 

システム延長

1100 m

 

設置年

2017

状況

The Wollongong Escarpment Area in Wollongong New South Wales is unstable and Bulli Pass is subject to rockslides especially in times of heavy rainfall. Bulli Pass has a history of slip and rock fall events. A major slip in 2008 required slope stabilisation works with the road being closed for seven weeks. Following several events, including a serious rock fall that landed on a vehicle in 2015, there have been extensive investigations into the upslope section of Bulli Pass.  After detailed analysis Geobrugg Australia was chosen as the preferred supplier of a Rock Fall and Landslide mitigation system.

説明

The project reduces the residual slope risk profile from landslide and rock fall events. The project consisted of a 1.1 km of SL-150 Shallow Landslide Barrier and a combination of VX and UX Shallow Landslide Barriers.  The system now provides rock fall and landslide protection from a road that has 12000 car movements a day.  The barrier is 3,5 m high including over 1000 rock nail anchors constructed in difficult terrain. The Barrier is also capable of containing a 500 kg rock travelling at 160 km/hour.

More information:

- Roads & Maritime, New South Wales

国名

オーストラリア

顧客名

Roads and Maritime Authority, New South Wales

エンジニアリング

Department of Public Works, (Project Management)

落札者

Specialised Geo Pty Ltd (GHD Contractor)

下請

Consultant Andrew Hunter Coffey/GHD (Geotechnical Consultant); Consultant Philip Flentje (University of Wollongong)

保護対象

道路

腐食防止

ジェオブルッグ ウルトラコーティング

担当者の連絡先

Saleh Feidi
 

Saleh Feidi

Regional Manager California

自然災害防護
衝撃防護
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / アメリカ合衆国 Regional Manager California

お問い合わせフォーム

Bryant Jackson
 

Bryant Jackson

Regional Sales Manager Northeast

自然災害防護
衝撃防護
Geobrugg North America, LLC,22 Centro Algodones Regional Sales Manager Northeast

お問い合わせフォーム

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

自然災害防護
衝撃防護
Geobrugg North America, LLC,KS 67226 Wichita / アメリカ合衆国 Regional Manager Rocky Mountains / Central USA

お問い合わせフォーム

Robert Long
 

Robert Long

Regional Sales Manager Southeast

自然災害防護
衝撃防護
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / アメリカ合衆国 Regional Sales Manager Southeast

お問い合わせフォーム

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

お問い合わせフォーム

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

自然災害防護
衝撃防護
Geobrugg North America, LLC,OR 97302 Salem / アメリカ合衆国 Regional Sales Manager Pacific Northwest and Hawaii

お問い合わせフォーム