スイス
スイス

myGeobrugg

 - Borso del Grappa, Veneto 2021

Rockfall barriers above the road

 - Borso del Grappa, Veneto 2021

Rocky slope covered with DELTAX mesh

 - Borso del Grappa, Veneto 2021

Rockface covered with SPIDER mesh

 
 

設置年

2021

状況

Rockfalls are frequent at this section of the road near Treviso. The boulders, from centimetric pebbles up to sizes of 2 cubic meters, are a risk for drivers passing this stretch of road.

説明

To ensure safety, there were installed: 

  • DELTAX® G80/4 mesh adherent to the rock face
  • SPIDER® mesh S3-130 to consolidate an intensely fractured rock tower close to the road 
  • Rockfall barriers GBE-500A and GBE-1000A to prevent rocks from falling onto the highway. 

担当者の連絡先

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

お問い合わせフォーム

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

自然災害防護
Hydraulic Engineering
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス , Msc. Env. Eng.

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

お問い合わせフォーム