비탈면 보강 시스템 - Schönegründ B462 2012

.

비탈면 보강 시스템 - Schönegründ B462 2012

.

비탈면 보강 시스템 - Schönegründ B462 2012

.

비탈면 보강 시스템 - Schönegründ B462 2012

.

 
 

Year of installation

2012

Situation

-

Description

Heavy rainfall caused repeated landslips, sending loose masses of earth down onto the B462 highway. The slope was dimensioned with regard to overall stability (lower slip surfaces) and to combat surface instabilities. First of all, several heavily weathered areas of the slope were secured using shotcrete seals. The high-tensile TECCO® System mesh was then combined with the dimensioned nail grid and installed. To protect against lose rockfall from the upper area of the slope, the edge of the TECCO® System mesh was elevated on the mountain side using a bracing rope mounted on posts.

Customer

Regierungspräsidium Karlsruhe, Dienstsitz Freudenstadt

Contractor

Sachtleben Mining Services GmbH, Wolfach

Protected object

Road

Engineering

Ingenieurgruppe Geotechnik, Kirchzarten

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail