비탈면 보강 시스템 - Bridger Coal Mine 2004

Protective mesh installed on the rockface slope

비탈면 보강 시스템 - Bridger Coal Mine 2004

Installation of TECCO® G65/3

비탈면 보강 시스템 - Bridger Coal Mine 2004

Installed TECCO®

비탈면 보강 시스템 - Bridger Coal Mine 2004

Mesh covering the rock

 
 

Year of installation

2004

Situation

At this open pit mine, tunnel portals were put to go underground to follow coal seams. These tunnel portals are located at the bottom of a high wall.

Description

The high wall was draped with TECCO® System mesh to protect personnel and equipment during construction and operation of the portals.

Customer

Private

Contractor

Yenter Companies

Protected object

Mine / Quarry

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

Seegmiller International

Other installed applications

터널, 광산

Your local contact

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

자연 재해
유압 공학
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 미국 Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

자연 재해
유압 공학
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 미국 Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

자연 재해
유압 공학
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 미국 Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

자연 재해
유압 공학
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 미국 Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

자연 재해
Geobrugg North America, LLC,Salem OR 97302 / 미국 Sales Director

E-Mail