Svizzera
Svizzera

myGeobrugg

West Virginia Abandoned Mine

Consolidamento di versanti - West Virginia Abandoned Mine 2006

TECCO® stabilized masonry block wall

Consolidamento di versanti - West Virginia Abandoned Mine 2006

Failed masonary-block wall prior to reconstruction

Consolidamento di versanti - West Virginia Abandoned Mine 2006

Mine refuse slope prior to stabilization

Consolidamento di versanti - West Virginia Abandoned Mine 2006

Drilling anchors

Consolidamento di versanti - West Virginia Abandoned Mine 2006

TECCO® Slope Stabilization

 
 

Anno di installazione

2006

Situazione iniziale

Prior to the 1977 Surface Mining Act, coal refuse was dumped along the sides of hill slopes or into hollows without compaction or attention to drainage control or erosion. Over time, these slopes can significantly displace and fail. At an abandoned mine lands site in West Virginia, there was an unstable slope consisting of mine refuse and also a masonry stone block wall that was failing.

Subsoil:
Basalt
Residual soil/coluvium

Geologia

mine refuse

Descrizione

Today, anchored TECCO G65-3mm mesh stabilizes the unstable mine refuse slope and the stone wall. The anchors were installed through the failing wall into the stable surface.

Cliente

WV Department of Environmental Protection

Contraente:

Green Mountain Construction

Oggetto protetto

Strada, Cava / Miniera

Protezione dalla corrosione

GEOBRUGG SUPERCOATING

Progettazione:

Ackenheil Engineering

Altre applicazioni installate

Miniera / Gallerie

Il contatto locale

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Industriestrasse 21,5200 Brugg / Svizzera Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Sistemi contro il dissesto idrogeologico
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Svizzera Ticino Country Manager

E-mail