Svizzera
Svizzera

myGeobrugg

Tidong-I Hydro Electric Project, Himachal Pradesh

Protezione da caduta massi - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

GBE 2000A rockfall barrier

Protezione da caduta massi - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

The location

Protezione da caduta massi - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

Installation of QUAROX® Rolled Cable Net at the power house

Protezione da caduta massi - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

Drilling work at the power house

Protezione da caduta massi - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

QUAROX® RCN during installation at the surge shaft

Protezione da caduta massi - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

Construction works at the surge shaft

Protezione da caduta massi - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

Erection work of GBE-2000A rockfall barrier

Protezione da caduta massi - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

GBE-2000A Rockfall Barrier

Protezione da caduta massi - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

Snowfall after installation of QUAROX®. The solution is not interfering with the natural beauty of this place

 

Anno di installazione

2019

Situazione iniziale

The project is located in the Himachal Pradesh state of India and almost 40 km to the east of Kalpa. The power house below a cut and natural slope needed protection against rock falls. Similar to the power house the surge shaft cut also required to be supported by rockfall barrier and rock fall net.

Geology:  The project area lies in Mehbar and Maldi gneisses comprised of kyanite and psamatic gneisses with bands of schist and quartzite. These are intruded by basic and acidic rocks. Some of the rocks are well folliated. The general trends are North-South with moderate trend towards East. These are transacted by number of joints of which the folliation and strike joints are most predominantly followed in frequency by steeply dipping transverse joints.

Descrizione

GBE-2000A of length 50 meters and GBE-1000A of length 30 meters were installed.

The authorities also decided to install flexible slope stabilization system QUAROX® rolled cable net, with GEOBRUGG SUPERCOATING and high-tensile rockfall protection netting DELTAX® G80/2 (Secondary mesh)

Area: 13500 sq.m. Variable grid pattern and fully grouted rock bolts of diameter 32 mm / length 3 m, fully threaded with top 6" galvanized material, Grade EN8, Ft = 500 N/mm².

Cliente

Statkraft

Contraente:

Pioneer Foundation Engineers Pvt. Ltd.

Oggetto protetto

Strada, Infrastrutture, Altri

Protezione dalla corrosione

GEOBRUGG SUPERCOATING

Altre applicazioni installate

Consolidamento di versanti

Il contatto locale

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Industriestrasse 21,5200 Brugg / Svizzera Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Sistemi contro il dissesto idrogeologico
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Svizzera Ticino Country Manager

E-mail