Stati Uniti
Stati Uniti

myGeobrugg

Protezione contro frane e colate detritiche - San Alfonso Creeks 2022

Dynamic barrier for debris flow control located in “azul” creek

Protezione contro frane e colate detritiche - San Alfonso Creeks 2022

Dynamic barriers for debris flow control

Protezione contro frane e colate detritiche - San Alfonso Creeks 2022

Dynamic barrier for debris flow control located in “azul” creek, aerial view

Protezione contro frane e colate detritiche - San Alfonso Creeks 2022

Aerial view of dynamic barrier for debris flow control located in "roja" creek

Protezione contro frane e colate detritiche - San Alfonso Creeks 2022

Aerial view of dynamic barrier for debris flow control located in "violeta” creek

Protezione contro frane e colate detritiche - San Alfonso Creeks 2022

Aerial view of dynamic barrier for debris flow control located in "marrón" creek

Protezione contro frane e colate detritiche - San Alfonso Creeks 2022

Detail view of ring net connection with middle wire ropes

Protezione contro frane e colate detritiche - San Alfonso Creeks 2022

Ring net for debris flow control

 

Sistemi

 

Lunghezza del sistema

- 15 m

 

Anno di installazione

2022

Situazione iniziale

During 2021, due to meteorological events that activated different streams in the San Alfonso region (San José de Maipo), a series of floods were triggered that affected the residents of the area.

These floods had highly destructive consequences for the community, road infrastructure and services, so the water works department requested as an emergency measure the installation of a system to mitigate future events of these characteristics.

Descrizione

Considering the number of activated streams, the amount of material dragged by the debris flow and the size of these streams, it was decided to install ten VX140-type barriers in five different streams.

Cliente

Directorate of Hydraulic Works DOH

Contraente:

SEINCO

Oggetto protetto

Strada, Infrastrutture turistiche, Zona residenziale, Infrastrutture

Protezione dalla corrosione

Galvanized, GEOBRUGG SUPERCOATING

Il contatto locale

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / Stati Uniti Regional Manager Northeast

E-mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / Stati Uniti Regional Manager California

E-mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / Stati Uniti Regional Manager Central US

E-mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / Stati Uniti Regional Manager Southeast

E-mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Sistemi contro il dissesto idrogeologico
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Sistemi contro il dissesto idrogeologico
Geobrugg North America, LLC,Salem OR 97302 / Stati Uniti Sales Director

E-mail