Stati Uniti
Stati Uniti

myGeobrugg

Piwniczna-Zdrój: National Road DK87

Protezione da caduta massi - Piwniczna-Zdrój: National Road DK87 2016

The National Road DK87 near Piwniczna-Zdrój is protected with Geobrugg's rockall barriers - this road along the Polish-Slovakian border is facing a lot of touristic traffic

Protezione da caduta massi - Piwniczna-Zdrój: National Road DK87 2016

The National Road DK87 during renovation works - the dense forest makes it difficult to assess the possible risk

Protezione da caduta massi - Piwniczna-Zdrój: National Road DK87 2016

During the DK87 renovation works many rockfalls were spotted and it was decided to install rockfall barriers

Protezione da caduta massi - Piwniczna-Zdrój: National Road DK87 2016

The National Road DK87 in Piwniczna-Zdrój protected by a GBE-500A rockfall barrier

Protezione da caduta massi - Piwniczna-Zdrój: National Road DK87 2016

Sandstone outcrops are hidden in the forest endangering the road

Protezione da caduta massi - Piwniczna-Zdrój: National Road DK87 2016

The GBE-500A is the most cost effective rockfall barrier in its class - also due to its unique simplicity

Protezione da caduta massi - Piwniczna-Zdrój: National Road DK87 2016

GBE-500A barrier border details - visible unique U-brake elements offering long lasting performance

Protezione da caduta massi - Piwniczna-Zdrój: National Road DK87 2016

Another area of the National Road DK87 protected with a GBE-100A-R rockfall barrier

Protezione da caduta massi - Piwniczna-Zdrój: National Road DK87 2016

As an extra safety measure, a small, customized debris flow barrier was also installed

 

Lunghezza del sistema

72 m - 252 m

 

Anno di installazione

2016

Situazione iniziale

Along the Polish-Slovakian border a new border crossing (new bridge above Poprad river) was built. That also caused a need of a National Road DK87 renovation. During construction works it was decided to install also a rockfall protection.  

Descrizione

Four barrier lines were designed. The very fast installation took place in September 2016.

Cliente

Generalna Dyrekcja Dróg Krajowych i Autostrad (National Roads Directory)

Contraente:

BMD Sp. z o.o.

Oggetto protetto

Strada

Protezione dalla corrosione

Galvanized, GEOBRUGG SUPERCOATING

Progettazione:

BMD Sp. z o.o.

Il contatto locale

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / Stati Uniti Regional Manager Northeast

E-mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / Stati Uniti Regional Manager California

E-mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / Stati Uniti Regional Manager Central US

E-mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / Stati Uniti Regional Manager Southeast

E-mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Sistemi contro il dissesto idrogeologico
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Sistemi contro il dissesto idrogeologico
Geobrugg North America, LLC,Salem OR 97302 / Stati Uniti Sales Director

E-mail