Svizzera
Svizzera

Palena

Palena - Abruzzo, Italia
2003
Cliente
Municipality of Palena
Progettazione:
Dr. Ing. Alessandro Marini
Contraente:
CO.GE.PRI. srl - PIaneta Montagna
Oggetto protetto
Strada, Costruzione
Esposizione
A nord
Situazione iniziale

The stretch of embankment in question was long since subject to erosion problems because of the presence of nonlinear stretches in correspondence with the material removal, in case of signifi cant fl ows. This involved problems of poor stability for the road above and for the buildings that were immediately behind.

Descrizione

The TECCO® choice by the design engineer was made for various reasons of which we should mention the high-tensile steel wire TECCO® mesh unit (high tensile 1770 N/mm2); the special anticorrosive treatment with aluminium-zinc alloy (GEOBRUGG SUPERCOATING); and the high bearing resistance of the mesh, by applying tension to it with the penetration of the special TECCO® cuspate shaped plates for the distribution of the anchorage loads in the bank's soil. These elements guaranteed by the TECCO® System are not present in the traditional bank protection method with gabions. Furthermore, the
particularly fast timeline for the implementation of the TECCO® System played a major part given that the work was done late in the season.

Il contatto locale

Roger Moor
Roger Moor
Country Manager Ost- und Zentralschweiz, Liechtenstein
Sistemi contro il dissesto idrogeologico, Protezione delle coste e regimentazione dei corsi d’acqua, Miniera / Gallerie
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Svizzera
René Müller
René Müller
Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS
Sistemi contro il dissesto idrogeologico, Miniera / Gallerie
Geobrugg AG
Industriestrasse 21
5200 Brugg / Svizzera
Isacco Toffoletto
Isacco Toffoletto
Ticino Country Manager
Sistemi contro il dissesto idrogeologico, Miniera / Gallerie
Geobrugg AG Ticino
Stabile Cometal, via Pizzante 7
6595 Riazzino / Svizzera