Svizzera
Svizzera

myGeobrugg

National Highway 222, Malchej Ghat

Consolidamento di versanti - National Highway 222, Malchej Ghat 2014

After completion of the installation

Consolidamento di versanti - National Highway 222, Malchej Ghat 2014

.

Consolidamento di versanti - National Highway 222, Malchej Ghat 2014

Temple protection works

Consolidamento di versanti - National Highway 222, Malchej Ghat 2014

Work in progress

Consolidamento di versanti - National Highway 222, Malchej Ghat 2014

.

Consolidamento di versanti - National Highway 222, Malchej Ghat 2014

.

Consolidamento di versanti - National Highway 222, Malchej Ghat 2014

The rockfall incident in July 2013, before the installation of the protection system

Consolidamento di versanti - National Highway 222, Malchej Ghat 2014

.

 

Anno di installazione

2014

Situazione iniziale

Malchej Ghat is a mountain pass nestled in the lofty rugged hills of the Western Ghat range in the Thane district of Maharashtra, India. It is home to hundreds of different kinds of flora and fauna, including a variety of birds such as quail, rails, crakes, flamingos and cuckoos. The area is notorious for landslide during monsoons. Malchej Ghat is situated in the Pune district, 160 Km from Mumbai and 130 km from Pune.

National Highway 222 connecting the states of Maharashtra and Telangana passes Malchej Ghat. The project location at km 92.200 is also a tourist site with a famous waterfall and a pilgrimage site with an old temple. Because of frequent rock falls during the monsoon season, the state highway is often closed for several days which severely affects the day to day life of the nearby cities. During a rockfall event in 2013, boulders weighing around 5 tons rolled down the slope and damaged vehicles and injured people in the temple area.

Descrizione

The Public Works Department at Thane has the responsibility of maintaining the road and approached Geobrugg India to install rockfall mitigation. Geobrugg installed a QUAROX® net over a layer of DELTAX® mesh along the nearly vertical slope that rises nearly 120 m from the road level. The net is held in place with the support of 50 fully grouted 2 m long anchors (28 mm diameter). The complete work was carried out with the help of rope access technicians.

Cliente

Public Works Department, National Highways

Contraente:

Pioneer Foundation Engineers, Mumbai

Oggetto protetto

Strada, Costruzione

Protezione dalla corrosione

GEOBRUGG SUPERCOATING, GEOBRUGG ULTRACOATING

Il contatto locale

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Industriestrasse 21,5200 Brugg / Svizzera Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Sistemi contro il dissesto idrogeologico
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Svizzera Ticino Country Manager

E-mail