Stati Uniti
Stati Uniti

myGeobrugg

National Highway 222, Malchej Ghat

Consolidamento di versanti - National Highway 222, Malchej Ghat 2014

After completion of the installation

Consolidamento di versanti - National Highway 222, Malchej Ghat 2014

.

Consolidamento di versanti - National Highway 222, Malchej Ghat 2014

Temple protection works

Consolidamento di versanti - National Highway 222, Malchej Ghat 2014

Work in progress

Consolidamento di versanti - National Highway 222, Malchej Ghat 2014

.

Consolidamento di versanti - National Highway 222, Malchej Ghat 2014

.

Consolidamento di versanti - National Highway 222, Malchej Ghat 2014

The rockfall incident in July 2013, before the installation of the protection system

Consolidamento di versanti - National Highway 222, Malchej Ghat 2014

.

 

Anno di installazione

2014

Situazione iniziale

Malchej Ghat is a mountain pass nestled in the lofty rugged hills of the Western Ghat range in the Thane district of Maharashtra, India. It is home to hundreds of different kinds of flora and fauna, including a variety of birds such as quail, rails, crakes, flamingos and cuckoos. The area is notorious for landslide during monsoons. Malchej Ghat is situated in the Pune district, 160 Km from Mumbai and 130 km from Pune.

National Highway 222 connecting the states of Maharashtra and Telangana passes Malchej Ghat. The project location at km 92.200 is also a tourist site with a famous waterfall and a pilgrimage site with an old temple. Because of frequent rock falls during the monsoon season, the state highway is often closed for several days which severely affects the day to day life of the nearby cities. During a rockfall event in 2013, boulders weighing around 5 tons rolled down the slope and damaged vehicles and injured people in the temple area.

Descrizione

The Public Works Department at Thane has the responsibility of maintaining the road and approached Geobrugg India to install rockfall mitigation. Geobrugg installed a QUAROX® net over a layer of DELTAX® mesh along the nearly vertical slope that rises nearly 120 m from the road level. The net is held in place with the support of 50 fully grouted 2 m long anchors (28 mm diameter). The complete work was carried out with the help of rope access technicians.

Cliente

Public Works Department, National Highways

Contraente:

Pioneer Foundation Engineers, Mumbai

Oggetto protetto

Strada, Costruzione

Protezione dalla corrosione

GEOBRUGG SUPERCOATING, GEOBRUGG ULTRACOATING

Il contatto locale

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / Stati Uniti Regional Manager Northeast

E-mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / Stati Uniti Regional Manager California

E-mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / Stati Uniti Regional Manager Central US

E-mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / Stati Uniti Regional Manager Southeast

E-mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Sistemi contro il dissesto idrogeologico
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Sistemi contro il dissesto idrogeologico
Geobrugg North America, LLC,Salem OR 97302 / Stati Uniti Sales Director

E-mail