Svizzera
Svizzera

myGeobrugg

Mühlehorn, Highway A3, Glarus Nord

Consolidamento di versanti - Mühlehorn, Highway A3, Glarus Nord 2015

Protected roadway and railway infrastructure

Consolidamento di versanti - Mühlehorn, Highway A3, Glarus Nord 2015

Drilling above the highway

Consolidamento di versanti - Mühlehorn, Highway A3, Glarus Nord 2015

Rockface after completion of the TECCO® installation

Consolidamento di versanti - Mühlehorn, Highway A3, Glarus Nord 2015

RXE type barriers and TECCO® System supporting each other

Consolidamento di versanti - Mühlehorn, Highway A3, Glarus Nord 2015

Location: Walensee, Switzerland Federal Office of Topography National Map 1:50'000

 
 

Anno di installazione

2015

Situazione iniziale

The highway A3 was opened in 1964 and passed as a 2-lane road the topographic bottleneck of the Walensee, one of the main threats on the way from the Swiss plains to the mountainous regions and ski resorts. In 1986 one of the most frequented tunnels was extended to four lanes. Due to a significant exposition to rockfall and rockslides, from the beginning of its existence the route had to be protected against natural hazards.

With increasing traffic and widening the formerly narrow path to a highway, also protection measures had to be adapted and extended.

In 2012 the Swiss Federal Roads Office FEDRO decided to realize several urgent maintenance works being unavoidable in order to keep the road open. In parallel risks and protection needs were re-evaluated and a general project to ensure safety of the highway was initiated. After the planning phase from 2013 to 2015 the first protection systems of the new generation were installed.

Hot-spots along the passage have been the various tunnel entrances, opening to steep slopes or even sheer rock faces.

Official project name at the FEDRO, Federal Office for Roads: Glarus Nord

Overall costs of the protection project (estimated in 2014): 11 Million Swiss Francs

Descrizione

This description shows the part stabilized with TECCO® System. A parallel project, Kerenzerberg HighKerenzerberg Highway A3 is showing rockfall barriers type RXE-8000 (also partly visible on the pictures).

Unstable slope and rock sections between and behind the fence lines were stabilized using TECCO® G65/4. Geology and topography required using the unique performance of TECCO® mesh as well as the strength of 4 mm high-tensile strength steel wire to bear the shearing forces and puncturing loads of stabilized rock masses.

Cliente

FEDRO Federal Roads Office, Switzerland

Contraente:

CRESTAGEO, Chur, Switzerland

Oggetto protetto

Strada, Ferrovia

Protezione dalla corrosione

GEOBRUGG SUPERCOATING

Progettazione:

Project Partners Ltd Consulting Engineers, Grancia-Lugano, Switzerland

Altre applicazioni installate

Protezione da caduta massi

Il contatto locale

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Industriestrasse 21,5200 Brugg / Svizzera Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Sistemi contro il dissesto idrogeologico
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Svizzera Ticino Country Manager

E-mail