Svizzera
Svizzera

myGeobrugg

Consolidamento di versanti - Lovers Walk, Brighton 2022

Protected slope between rail and residential area

Consolidamento di versanti - Lovers Walk, Brighton 2022

Shotcrete facing stabilised with mesh and spike plates

Consolidamento di versanti - Lovers Walk, Brighton 2022

Drilling for the slope stabilisation

Consolidamento di versanti - Lovers Walk, Brighton 2022

Detail on top of the slope

Consolidamento di versanti - Lovers Walk, Brighton 2022

View of the stabilized area from below

 
 

Anno di installazione

2022

Situazione iniziale

The project occurred over two phases, the first began in 2020 when BAM Ritchies was first approached to stabilise an area of unravelling on an existing shotcrete facing which was covering a chalk cutting. The site was precariously placed between a row of terraced houses on Stanford Lane and the operational train depot, part of Brighton Railway Station. 

Following completion of the emergency works and a further investigation, the decision was made to move forward and stabilise the majority of the 20 metres high 200 metres long chalk cutting with COWI acting as the designer. 

Geologia

Chalk - Newhaven Chalk Formation

Descrizione

The first stage of the solution involved emergency works to stabilise the area of unravelling, this included a small area of meshing and rock bolting as well as backfilling of the voided shotcrete facing using a thixotropic grout mix. 

The final engineered solution across the length of the slope, completed by BAM Ritchies in early 2022, included around 3000 square metres of TECCO G65/3 mesh with over 800 P33/50 spike plates installed and drainage paths also drilled. 

Cliente

Contraente:

Oggetto protetto

Ferrovia

Protezione dalla corrosione

GEOBRUGG SUPERCOATING

Progettazione:

Il contatto locale

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Industriestrasse 21,5200 Brugg / Svizzera Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Sistemi contro il dissesto idrogeologico
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Svizzera Ticino Country Manager

E-mail