Ligne 500 000 de Chartres à Bordeaux- Déblai du tunnel de la Ramade

Consolidamento di versanti - Ligne 500 000 de Chartres à Bordeaux- Déblai du tunnel de la Ramade 2024

The TECCO system combined with hydro mulching perfectly stabilizes the railway embankment and prevents further traffic disruption

Consolidamento di versanti - Ligne 500 000 de Chartres à Bordeaux- Déblai du tunnel de la Ramade 2024

Landslides cut off traffic

Consolidamento di versanti - Ligne 500 000 de Chartres à Bordeaux- Déblai du tunnel de la Ramade 2024

TECCO G45/2 mesh, in conjunction with nails, stabilizes the structure according to the dimensions specified

Consolidamento di versanti - Ligne 500 000 de Chartres à Bordeaux- Déblai du tunnel de la Ramade 2024

A coco revegetation mat is laid under the TECCO to keep the fine soil particles until the surface vegetation recovers

Consolidamento di versanti - Ligne 500 000 de Chartres à Bordeaux- Déblai du tunnel de la Ramade 2024

The hydro mulching operation is meticulously carried out to guarantee vegetation recovery

 
 

Anno di installazione

2024

Situazione iniziale

The railroad line 500 000 arrives in the Bordeaux urban area at Lormont and enters underground at the northern end of the Ramade tunnel. Before this tunnel’s entrance, the profile is excavated, with up to 15 meters high embankments. These embankments are made up of silt and sandy clay, generating landslides and repeatedly cutting the tracks.

Descrizione

TECCO was chosen as the optimum solution for this stabilization work. Dimensioning during the execution phase made optimizing the facing with a TECCO G45/2 possible, which greatly facilitated installation rates with a maximum cost/quality ratio for this project. The hydro mulching operation allowed the stabilization solution to be ideally finalized.

Paese / Regione

Francia

Cliente

SNCF Réseau

Progettazione:

SNCF Réseau

Contraente:

COFEX Géotechnique

Altre società partecipanti

CAN

Oggetto protetto

Ferrovia

Protezione dalla corrosione

GEOBRUGG SUPERCOATING

Il contatto locale

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / Stati Uniti Regional Manager Northeast

E-mail

Saleh Feidi
 

Saleh Feidi

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / Stati Uniti

E-mail

John Kalejta
 

John Kalejta

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Geobrugg North America, LLC,KS 67226 Wichita / Stati Uniti

E-mail

Bob Lyne
 

Bob Lyne

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / Stati Uniti

E-mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Sistemi contro il dissesto idrogeologico
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-mail

Tim Shevlin
 

Tim Shevlin

Sistemi contro il dissesto idrogeologico
Geobrugg North America, LLC,OR 97302 Salem / Stati Uniti

E-mail