GEOHAZARD - FOLLOW US
Quaternary fluvial sands.
Following heavy storms and flooding in 2015 significant erosion was caused to the riverbank under the castle.
In conjunction with the geotechnical contractor, who had already decided the slope needed soil nailing and TECCO® System, we looked to optimise the solution for the fine grained nature of the soil. We suggested the use of the TECCO® G45/2 in conjunction with an erosion control mat.
Telefono | +1 860 377 3230 |
Telefono | +1 909 706 8964 |
Telefono | +1 505 220 1404 |
Telefono | +1 336 337 0945 |
Telefono | +1 505 771 4080 |
Mobile | +1 505 400 0796 |
Telefono | +1 503 423 7258 |