Svizzera
Svizzera

myGeobrugg

Protezione da caduta massi - Bulli Pass (1) 2017

A 1,1 km long Shallow Landslide Barrier protects the road at Bulli Pass in New South Wales.

Protezione da caduta massi - Bulli Pass (1) 2017

Placing concrete for post footings ©NSW Government

Protezione da caduta massi - Bulli Pass (1) 2017

Overview of work site ©NSW Government

Protezione da caduta massi - Bulli Pass (1) 2017

Site preparation ©NSW Government

Protezione da caduta massi - Bulli Pass (1) 2017

Installation of barrier mesh fencing ©NSW Government

Protezione da caduta massi - Bulli Pass (1) 2017

Work near satefy ramp ©NSW Government

Protezione da caduta massi - Bulli Pass (1) 2017

Installed posts and footings ©NSW Government

Protezione da caduta massi - Bulli Pass (1) 2017

Cranes lifting rock fall protection barrier components into position above Bulli Pass ©NSW Government

Protezione da caduta massi - Bulli Pass (1) 2017

Precast concrete pad footings for the rockfall protection barrier posts ©NSW Government

Protezione da caduta massi - Bulli Pass (1) 2017

Rear side of the barrier with brakes

 

Lunghezza del sistema

1100 m

 

Anno di installazione

2017

Situazione iniziale

The Wollongong Escarpment Area in Wollongong New South Wales is unstable and Bulli Pass is subject to rockslides especially in times of heavy rainfall. Bulli Pass has a history of slip and rock fall events. A major slip in 2008 required slope stabilisation works with the road being closed for seven weeks. Following several events, including a serious rock fall that landed on a vehicle in 2015, there have been extensive investigations into the upslope section of Bulli Pass.  After detailed analysis Geobrugg Australia was chosen as the preferred supplier of a Rock Fall and Landslide mitigation system.

Descrizione

The project reduces the residual slope risk profile from landslide and rock fall events. The project consisted of a 1.1 km of SL-150 Shallow Landslide Barrier and a combination of VX and UX Shallow Landslide Barriers.  The system now provides rock fall and landslide protection from a road that has 12000 car movements a day.  The barrier is 3,5 m high including over 1000 rock nail anchors constructed in difficult terrain. The Barrier is also capable of containing a 500 kg rock travelling at 160 km/hour.

More information:

- Roads & Maritime, New South Wales

Cliente

Roads and Maritime Authority, New South Wales

Contraente:

Specialised Geo Pty Ltd (GHD Contractor)

Oggetto protetto

Strada

Protezione dalla corrosione

GEOBRUGG ULTRACOATING

Progettazione:

Department of Public Works, (Project Management)

Altre società partecipanti

Consultant Andrew Hunter Coffey/GHD (Geotechnical Consultant); Consultant Philip Flentje (University of Wollongong)

Altre applicazioni installate

Protezione contro frane e colate detritiche

Il contatto locale

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Industriestrasse 21,5200 Brugg / Svizzera Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Sistemi contro il dissesto idrogeologico
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Svizzera Ticino Country Manager

E-mail