Stati Uniti
Stati Uniti

myGeobrugg

Protezione contro frane e colate detritiche - Bridge of Orchy 2025

Shallow landslide barrier protecting the West Highland Line

Protezione contro frane e colate detritiche - Bridge of Orchy 2025

Shallow landslide barrier and anchor

Protezione contro frane e colate detritiche - Bridge of Orchy 2025

View of the SL-barrier, north end

Protezione contro frane e colate detritiche - Bridge of Orchy 2025

Landslide barrier and brake ring

Protezione contro frane e colate detritiche - Bridge of Orchy 2025

Solution to bottom support rope taut with foundation

Protezione contro frane e colate detritiche - Bridge of Orchy 2025

Barrier with the protected railway line underneath

 

Sistemi

 

Lunghezza del sistema

45 m

 

Anno di installazione

2025

Situazione iniziale

In 2020, a significant landslide occurred on the West Highland Line, primarily caused by water runoff through the hillside. The landslide blocked the railway, forcing a full route closure while repairs were undertaken.

Given the ongoing risk posed by heavy and persistent rainfall, the site conditions were closely monitored. As part of the long-term protection strategy, a 45-metre SL-150 barrier was installed to mitigate the impact on the railway from further landslips.

Descrizione

Working in collaboration with contractor QTS and designer Fairhurst, a 45-metre barrier solution was designed for Network Rail. Post spacing varies between 7 and 8 metres to suit the local topography.

We supported the project by supplying the barrier system and contributing technical input during the design and installation phases. Preserving the surrounding landscape was a key consideration; accordingly, the upslope anchor layout at the far end of the barrier was adapted to minimise environmental impact and reduce disruption during installation.

After the barrier installation, we carried out an in-house sign-off process called a CONSIS inspection to ensure the project met our rigorous quality and safety standards.

Network Rail made it clear that this sign-off was a critical part of the project’s delivery, reflecting their commitment to quality assurance and the successful delivery of the solution.

Paese / Regione

Regno Unito

Cliente

Progettazione:

Contraente:

QTS

Altre società partecipanti

Oggetto protetto

Ferrovia

Protezione dalla corrosione

GEOBRUGG SUPERCOATING

Il contatto locale

Saleh Feidi
 

Saleh Feidi

Sistemi contro il dissesto idrogeologico
DPC per l’industria e l’edilizia
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / Stati Uniti

E-mail

Bryant Jackson
 

Bryant Jackson

Sistemi contro il dissesto idrogeologico
DPC per l’industria e l’edilizia
Geobrugg North America, LLC,22 Centro Algodones,87001 Algadones / Stati Uniti

E-mail

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Sistemi contro il dissesto idrogeologico
DPC per l’industria e l’edilizia
Geobrugg North America, LLC,KS 67226 Wichita / Stati Uniti Regional Manager Rocky Mountains / Central USA

E-mail

Robert Long
 

Robert Long

Regional Sales Manager Southeast

Sistemi contro il dissesto idrogeologico
DPC per l’industria e l’edilizia
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / Stati Uniti Regional Sales Manager Southeast

E-mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

Sistemi contro il dissesto idrogeologico
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

E-mail

Tim Shevlin
 

Tim Shevlin

Sistemi contro il dissesto idrogeologico
DPC per l’industria e l’edilizia
Geobrugg North America, LLC,2050 Timber St S,OR 97302 Salem / Stati Uniti

E-mail