Miniera / Gallerie - Hydropowerplant Chile II 2016

MINAX® reinforcement

Miniera / Gallerie - Hydropowerplant Chile II 2016

Two MESHA® working at the same time

Miniera / Gallerie - Hydropowerplant Chile II 2016

MESHA® dispositive working

Miniera / Gallerie - Hydropowerplant Chile II 2016

MESHA® installing MINAX® rock mesh

 

Anno di installazione

2016

Situazione iniziale

The Alto Maipo project consists of a hydroelectric plant which includes five high mountain intakes, 70 kilometers of tunnels at an average depth of 800 meters, two cavern power plants - Alfalfal II and Las Lajas- with a combined capacity of 531 MW and 17 kilometers of high voltage lines.

The relevant civil works consider 70 kilometers of tunnels excavated in solid rock, at an average depth of 800 meters. Its size is defined by the flow rate to be transported and the minimum dimensions required for the operation of the excavation machinery. The tunnels will conduct the water under pressure and at low speed, losing very little energy until it reaches the machine caverns.

Due to the mountain range area rock bursting problems have been registered. The require fortification in order to protect both human lives and the machinery necessary for the development of a tunnel.

Descrizione

For safety reasons MINAX® 80/4  rock mesh have been implemented: In order to provide the necessary energy absorption capacity in case of rock bursting that could occur due to the geological conditions of the tunnels of the Alto Maipo project.

At the same time, in order to optimize the fortification operation and safeguard the integrity of the workers, the MESHA® device has been implemented. The nailing is carried out fully mechanized.

Cliente

AES GENER

Oggetto protetto

Cava / Miniera, Altri

Protezione dalla corrosione

GEOBRUGG SUPERCOATING

Il contatto locale

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Industriestrasse 21,5200 Brugg / Svizzera Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Svizzera Ticino Country Manager

E-mail