미국
미국

myGeobrugg

비탈면 보강 시스템 - Cwmavon Landslide 2018

Completed site image from the south of site.

비탈면 보강 시스템 - Cwmavon Landslide 2018

Slope after failure and cleaning

비탈면 보강 시스템 - Cwmavon Landslide 2018

Site after tree clearance

비탈면 보강 시스템 - Cwmavon Landslide 2018

Installation from top down of TECCO® GREEN

비탈면 보강 시스템 - Cwmavon Landslide 2018

Skid drill rig installing soil nails

비탈면 보강 시스템 - Cwmavon Landslide 2018

View of the full site including mobile elevated work platform (MEWP)

비탈면 보강 시스템 - Cwmavon Landslide 2018

Image from the north of site, showing the contouring of the mesh

비탈면 보강 시스템 - Cwmavon Landslide 2018

Natural vegetation regrowth through the TECCO® GREEN

비탈면 보강 시스템 - Cwmavon Landslide 2018

Boundary ropes and vegetation growth

 

Year of installation

2018

Situation

After prolonged periods of heavy rain and strong winds a large quantity of material was mobilised from the slope down onto the B4286. The road was closed for safety concerns whilst any remaining material was removed by hand. Traffic management was then installed and the road was re-opened as a single lane under traffic management.

Working closely with the local borough council, Geotechnical contractor Quantum Geotechnical and specialist rope access teams at iBEX a provisional stabilisation solution was put forward. This stabilisation utilised the excellent properties of TECCO® GREEN for both strength and greening capabilities. Quantum Geotechnical employed Remedy Geotechnics to ensure the provisional design was suitable, and all was agreed.

Geology

Brithdir Member - Sandstone. Sedimentary Bedrock formed approximately 308 to 310 million years ago in the Carboniferous Period.

These sedimentary rocks are fluvial in origin. They are detrital, ranging from course- to fine-grained and form beds and lenses of deposits reflecting the channels, Floodplains, and levees of a river.

Description

After harvesting of all trees on the full slope and specialist removal of tree stumps and roots on the slip plane, drilling works started from top down. In total 19 rolls of TECCO® GREEN, were installed with 150 soil nails.

Customer

Neath Port Talbot county borough council

Contractor

Quantum Geotechnical

Protected object

Road, Residential area, Infrastructure

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

Remedy Geotechnics

Subcontractor

iBEX technical access

Your local contact

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

자연 재해
유압 공학
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 미국 Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

자연 재해
유압 공학
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 미국 Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

자연 재해
유압 공학
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 미국 Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

자연 재해
유압 공학
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 미국 Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

자연 재해
Geobrugg North America, LLC,Salem OR 97302 / 미국 Sales Director

E-Mail