Suisse
Suisse

myGeobrugg

Stabilisation des pentes - Zion Hill 2015

TECCO® SYSTEM3 after all protection works are finished.

Stabilisation des pentes - Zion Hill 2015

Installed TECCO® SYSTEM3.

Stabilisation des pentes - Zion Hill 2015

TECCO® G65/3 rolls during installation.

Stabilisation des pentes - Zion Hill 2015

Slope nails installation using portable, suspended drill rig. For extra protection drilling works were executed through TECCO® G65/3 mesh.

 

Systèmes

 

Année d’installation

2015

Situation de départ

Rockfall from the channel wings meant risk for the channel workers.

Description

Slope stabilization with TECCO® SYSTEM3 mesh and anchors with 32 mm diameter every 2.5 m.

Client

Autoridad del Canal de Panamá - ACP

Entrepreneur

Alvarado & Düring International

Protection anticorrosion

GEOBRUGG SUPERCOATING

Ingénierie

Autoridad del Canal de Panamá - ACP

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail