Stabilisation des pentes - Zagorje-Trbovlje 2019

Rockface with the protective mesh

Stabilisation des pentes - Zagorje-Trbovlje 2019

Clearing works after the collapse of the slope

Stabilisation des pentes - Zagorje-Trbovlje 2019

Works after the slope failure

Stabilisation des pentes - Zagorje-Trbovlje 2019

Protected rockface after the installation of the drape

Stabilisation des pentes - Zagorje-Trbovlje 2019

The outer parts have been stabilized

Stabilisation des pentes - Zagorje-Trbovlje 2019

Close-up: The rockfall protection drape controls and guides falling rocks and debris

 

Année d’installation

2019

Situation de départ

After a period of continuous rain in February 2019, a slope collapsed on the road between Zagorje and Trbovlje. Between 10,000 m³ and 15,000 m³ of rock, debris blocked the road on a 70 meters long section, reaching a height of up to 3 meters. Because of the importance of the road, it was crucial to reopen it in the shortest time possible.

Description

As part of preparation works, more than 1,000 m³ of material was blasted to remove larger unstable blocks; blasting holes were drilled 20 m deep with portable drilling rigs. Due to very demanding geological conditions, a mesh solution with  TECCO® G65/4 was chosen. Left and right side of the slope were anchored with GEWI 40 mm (l=10 m). In the middle section of the rockface, the mesh was installed as a drape system. Concrete walls on the bottom of the slope complete the mesh system.

The road was safe again eleven weeks after the incident, only.

Client

DRSI

Entrepreneur

Kaskader d.o.o.

Objet protégé

Route/Rue

Protection anticorrosion

GEOBRUGG SUPERCOATING

Ingénierie

TERRAS Zdenka Popović s.p.

Autres applications installées

Protection contre les chutes de pierres

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail