Stabilisation des pentes - Wellards Way 2021

The slope following installation

Stabilisation des pentes - Wellards Way 2021

Site visit 20th October 2020

Stabilisation des pentes - Wellards Way 2021

Site visit 19th October 2021 with revegation

 

Année d’installation

2021

Situation de départ

Due to recent bad weather, there became a hazard of chalk blocks coming loose from the slope above and falling onto the zig-zagging footpath below. The footpath provides the only point of access for crossing the existing railway (directly south) to Shakespeare Beach, and it was key that the route was made safe for public use.

Géologie

New Pit Chalk Formation - a chalk of the Cretaceous Period.

Description

Following a visit to the site in October 2020, we worked with the contractor, South East Abseiling, to find an appropriate solution for the problem. Due to the site’s proximity to the sea, a stainless steel mesh was recommended to ensure the highest degree of corrosion protection.

We supplied TECCO STAINLESS G65/3 and TECMAT and stainless steel P33/40 spike plates to ensure stablisation and revegetation of the existing slope. We maintained close contact with the contractor during the works, always on hand to answer technical queries related to installation and performance of our system. In particular, we advised the appropriate method of installation for TECMAT beneath TECCO STAINLESS G65/3 to ensure there was no contamination and subsequent degradation of the corrosion protection provided by the stainless steel mesh.
The result was a tidy installation and successful slope stablisation. A follow-up site visit was undertaken in October 2021, showing beginning revegetation.

Client

Entrepreneur

Objet protégé

Chemin de fer, Infrastructure touristique

Protection anticorrosion

INOX / STAINLESS

Votre contact local

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / Etats-Unis Regional Manager Northeast

E-mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / Etats-Unis Regional Manager California

E-mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / Etats-Unis Regional Manager Central US

E-mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / Etats-Unis Regional Manager Southeast

E-mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Risques naturels
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Risques naturels
Geobrugg North America, LLC,Salem OR 97302 / Etats-Unis Sales Director

E-mail