Suisse
Suisse

myGeobrugg

Stabilisation des pentes - Waiheke Island (1) 2018

View from above - TECCO® STAINLESS G65/3 with stainless P33/50 spike plates - Note tree holes and proximity to the sea

Stabilisation des pentes - Waiheke Island (1) 2018

View from above - TECCO® STAINLESS G65/3 with stainless P33/50 spike plates - Note tree holes

 

Année d’installation

2018

Situation de départ

Erosion and subsequent slumping of the slope below a coastal property required a corrosion resistant solution to actively support the slope and prevent further undercutting. The rehabilitation area was 600 m².

Description

The mesh selected was TECCO® STAINLESS G65/3 due to its strength properties, superior corrosion resistance (stainless), low visibility, uniform strength for anchor placement and speed of installation. The TECCO® SYSTEM also allowed tree holes to be cut for planting of the slope.

Client

Private

Entrepreneur

Groundfix

Objet protégé

Bâtiment

Protection anticorrosion

INOX / STAINLESS

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail