Protection contre les chutes de pierres - Valley of Tempe 2010

Overview of the construction site showing the importance for the protection measures

Protection contre les chutes de pierres - Valley of Tempe 2010

Fatal accident in the Valley of Tempe, main trigger for the further installed measures

Protection contre les chutes de pierres - Valley of Tempe 2010

Another rockfall accident in the Valley of Tempe

Protection contre les chutes de pierres - Valley of Tempe 2010

SPIDER®-System installation on the rockface directly next to the road

Protection contre les chutes de pierres - Valley of Tempe 2010

SPIDER®-System installation on the rockface directly next to the road. Rockface is actively stabilized

Protection contre les chutes de pierres - Valley of Tempe 2010

Road protected with RX-300 rockfall barrier (for 3000 kJ) and below road destroyed by rockfall

Protection contre les chutes de pierres - Valley of Tempe 2010

Road protected with RX-300 rockfall barrier (for 3000 kJ) - below visible road reconstruction works

Protection contre les chutes de pierres - Valley of Tempe 2010

RX-300 rockfall barrier (for 3000 kJ) installation works

Protection contre les chutes de pierres - Valley of Tempe 2010

Road view just after all works implementation

 

Longueur du système

50 m - 300 m

 

Année d’installation

2010

Situation de départ

Témpi (also Tembi / Tembe / Τέμπη) Valley is the last remaining bottleneck along the Athens - Thessaloniki Motorway.  20,000 cars  pass by the eight kilometer long gorge each day. After two consecutive fatal rockfall events, the Agean Motorway SA closed the road in agreement with the ministry of street.

Description

Olympia Joint Venture signed a contract with Geobrugg to execute emergency rockfall mitigation measures with the aim to re-open the road for two weeks during Easter time. The remaing part of the work was to be completed by the end of May 2010.  In order to meet the deadline, 30 workers, six boomlifts, two truck cranes, six compressors and a helicopter were necessary.

Dangerous rock slopes were actively stabilized using TECCO® SYSTEM³ and SPIDER®.  A series of rockfall barriers were installed along the road.

Client

Olympia Joint Venture (Aktor – Hochtief)

Entrepreneur

Olympia Joint Venture (Aktor - Hochtief)

Objet protégé

Route/Rue

Protection anticorrosion

galvanisé, GEOBRUGG SUPERCOATING

Ingénierie

Omikron Kappa Consulting S.A.

Autres sociétés participantes

Crestageo AG, Geobrugg Italia Srl, Geobrugg Ibérica & Morocco S.A.U.

Votre contact local

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / Etats-Unis Regional Manager Northeast

E-mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / Etats-Unis Regional Manager California

E-mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / Etats-Unis Regional Manager Central US

E-mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Risques naturels
Ingénierie Hydraulique
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / Etats-Unis Regional Manager Southeast

E-mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Risques naturels
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

E-mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Risques naturels
Geobrugg North America, LLC,Salem OR 97302 / Etats-Unis Sales Director

E-mail