Suisse
Suisse

myGeobrugg

Laves torrentielles et coulées de boue - Trachtbach, Canton of Bern 2009

UX160-H4 equipped with abrasion control elements

Laves torrentielles et coulées de boue - Trachtbach, Canton of Bern 2009

UX-160-H4 combined with a bed reinforced with rock blocks.

Laves torrentielles et coulées de boue - Trachtbach, Canton of Bern 2009

VX140-H4 was designed to perfectly fit within the stream.

Laves torrentielles et coulées de boue - Trachtbach, Canton of Bern 2009

VX140-H4 was designed to perfectly fit within the stream.

Laves torrentielles et coulées de boue - Trachtbach, Canton of Bern 2009

A light step excavator was used for drilling the anchors and the subsequent assembly of the ring net.

 

Longueur du système

15 m - 37 m

 

Année d’installation

2009

Situation de départ

The historic village of Brienz is built on an alluvial fan at the foot of a large catchment area. In 2005, after a period of extraordinarily heavy precipitation, the Trachtbach carried enormous amounts of debris and buried several buildings, a road and a tourist railway. To prevent similar impacts in future, the torrent was tamed with a combination of different protection measures including the GEOBRUGG debris flow barriers.

Description

The three VX ring net barriers in the Trachtbach have an almost identical flume geometry. All three barriers can retain a volume of 4,000 m³ for a total retention capacity of 12,000 m³.

The VX ring net barriers are dimensioned with a a clearly defined overflow section so there is no risk of the debris flow material breaking laterally. The abrasion plate protects the top of the barrier from potential damage by debris that may be present in subsequent flows and overflows. For drilling the anchors and the subsequent assembly of the ROCCO ring nets, a light step excavator was utilized. No heavy machinery was required for assembling the anchorages.

VX140-H4 dimensions:
Barrier 1: bottom width 5.5 m / top width 15 m
Barrier 2: bottom width 6.5 m / top width  17 m
Barrier 3: bottom width 7.0 m / top width  20 m

The single UX160-H4 barrier has a retention volume of 6,000 m³. The bottom width of the barrier is 16 m and the top width is 37 m.

In the event of complete barrier activation, the four barriers together provide an unfilled retention capacity of 18,000 m³.

Client

Political Community of Brienz

Objet protégé

Route/Rue, Bâtiment

Ingénierie

Kellerhals + Haefeli, Berne

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail