Stabilisation des pentes - Sturminster Newton 2024

Site overview - River Stour

Stabilisation des pentes - Sturminster Newton 2024

Close-up of mesh

Stabilisation des pentes - Sturminster Newton 2024

VSL International during installation works

 
 

Année d’installation

2024

Situation de départ

WSP acted as a design engineer on behalf of Dorset County Council to assess and propose a mitigation strategy for part of the A357 adjacent to the River Stour in Sturminster Newton, suffering from slope instability issues.

Due to the road above being cut into the existing bedrock, this removal of material and additional loading had, over time, caused instability of the slope below the road, and tension cracks had been forming in the recent past.

Because of the road’s proximity to the River Stour, which regularly rises significant distances up the slope, and the road above, often treated with de-icing salts during winter, the corrosion risk on site was of concern.

Géologie

Alluvium from the river is present directly adjacent to the water body.
Bedrock is mapped as being of the Todber Freestone Member, a limestone.

Description

VSL International was the chosen contractor who installed the nailed solution to stabilise the slope utilising TECCO G45/2, underlain with TECMAT to help prevent erosion control and promote revegetation of the site.

The designer chose an R32 hollow bar type, with nails of significant length to stabilise beneath the road and beyond. Nail spacing varied between 1.5 to 2 metres on site.

Due to the River Stour’s ever-changing height, works on site were difficult, especially when drilling the bottom row of nails. During the works, several structures were encountered near the river’s level, which were unrecorded but thought to be gabion-style structures, which caused disruption to drilling.

TECCO G45/2 stainless was the chosen mesh type due to the slope inclination and to remove the risk of corrosion from either road de-icing salts or possibly from the river. Geobrugg worked with VSL to assist with design and installation queries for the site and undertook regular site visits during the works. 

Pays / Région

Royaume-Uni

Ingénierie

WSP

Entrepreneur

Objet protégé

Rivière

Protection anticorrosion

INOX 1.4462 (AISI 318)

Votre contact local

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

Risques naturels
Ingénierie Hydraulique
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse , Msc. Env. Eng.

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suisse Country Manager Southern Switzerland

E-mail