Etats-Unis
Etats-Unis

myGeobrugg

Circuits de course / Pistes d’essai - Sepang International Circuit 2013

Geobrugg Debris Fence with a height of 4.5 meters to protect the spectators in Turn 1

Circuits de course / Pistes d’essai - Sepang International Circuit 2013

View to the grandstand Turn 1 protected by the Geobrugg Debris Fence

Circuits de course / Pistes d’essai - Sepang International Circuit 2013

Race action during the Formula 1 training session

Circuits de course / Pistes d’essai - Sepang International Circuit 2013

Geobrugg FIA debris fence protecting grandstand in Turn 1

 

Systèmes

 

Longueur du système

- 80 m

 

Année d’installation

2013

Situation de départ

The original debris fence was installed during the construction of the race track. After more than 12 years of racing, including several incidents, the SIC management decided to replace part of the debris fence with the new Geobrugg Debris Fence. The Geobrugg Debris Fence is the only debris fence fully tested in accordance to the FIA Institute test requirements and meets the stringent requirements made by SIC management.

The old debris fence was dismantled and the new Geobrugg Debris Fence installed in the shortest possible time.

Description

At Turn 1, a particularly demanding “snail bend”, a Geobrugg Debris Fence with a height of 4.5 meters was planned and approved. The high-strength ROMBO® G80/4 mesh enabled a rope spacing of 50 centimeters, which improved the view to the race track and reduced the installation time.

Client

Sepang International Circuit

Ingénierie

Geobrugg AG

Votre contact local

Marty Hunt
   

Marty Hunt

Project Manager Motorsport

Motorsport
Geobrugg Partner - Motorsport Logistics & Technology L.L.C.,PO Box 138,IN 46167 USA Pittsboro / Etats-Unis Project Manager Motorsport

E-mail