Suisse
Suisse

myGeobrugg

Protection contre les chutes de pierres - Schwarzenberg Murgtal Rappenriss 2015

GBE-1000A rockfall protection barrier together with TECCO® SYSTEM3 secure the Rappenriss rock face.

Protection contre les chutes de pierres - Schwarzenberg Murgtal Rappenriss 2015

Slope preparation work along the Rappenriss.

Protection contre les chutes de pierres - Schwarzenberg Murgtal Rappenriss 2015

Cleaning the slope where a GBE-1000A barrier is to be installed.

Protection contre les chutes de pierres - Schwarzenberg Murgtal Rappenriss 2015

GBE-1000A being staked for soil nails as part of slope preparation.

Protection contre les chutes de pierres - Schwarzenberg Murgtal Rappenriss 2015

Erecting the GBE-1000A barrier in the foreground and drilling the Rappenriss in the background.

Protection contre les chutes de pierres - Schwarzenberg Murgtal Rappenriss 2015

Drilling the nails at the Rappenriss with a lift. Below, the nearly complete GBE-1000A rockfall barrier is visible.

Protection contre les chutes de pierres - Schwarzenberg Murgtal Rappenriss 2015

Installing a GBE-1000A drape directly below a TECCO® SYSTEM3 that stabilizes a single block in the cliff above.

Protection contre les chutes de pierres - Schwarzenberg Murgtal Rappenriss 2015

Final installation of TECCO® G65/3 and TECCO® G65/4 meshes. Visible: full coverage of the Rappenriss massif.

 

Systèmes

 

Longueur du système

40 m - 130 m

 

Année d’installation

2015

Situation de départ

As part of the widening of the bicycle path along the main road (B462) a dominant rocky outcrop, the Rappenrisshad to be securely stabilized.

Description

To protect the road and the bike path two GBE 1000A rockfall barriers were installed. In addition parts of the slope were actively stabilized with TECCO® SYSTEM3 (TECCO® G65/3 and TECCO® G65/4).

Client

Regierungspräsidium Karlsruhe

Entrepreneur

Königl GmbH & Co KG

Objet protégé

Route/Rue, Infrastructure touristique

Protection anticorrosion

GEOBRUGG SUPERCOATING

Ingénierie

Ingenieurgruppe Geotechnik

Autres applications installées

Stabilisation des pentes

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail