Suisse
Suisse

myGeobrugg

Stabilisation des pentes - San José Calderas Road 27, km 47.75 2017

Slope stabilized with TECCO®

Stabilisation des pentes - San José Calderas Road 27, km 47.75 2017

Stainless mesh covering the slope

Stabilisation des pentes - San José Calderas Road 27, km 47.75 2017

Installation of the mesh

 

Année d’installation

2017

Situation de départ

After a superficial rock slide in 2016 lab studies showed that the safety of the slope had to be improved.

Géologie

Fractured and weathered rock

Description

TECCO® G65/3 STAINLESS was installed to protect the slope.

Client

GLOBALVIA

Entrepreneur

GEOSIS

Objet protégé

Route/Rue

Protection anticorrosion

INOX / STAINLESS

Ingénierie

INSUMA

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail