Suisse
Suisse

myGeobrugg

Stabilisation des pentes - Ringelaier Leite St 2127 2015

Single rock stabilization with SPIDER®-System.

Stabilisation des pentes - Ringelaier Leite St 2127 2015

Rockfall triggered by rock scaling.

Stabilisation des pentes - Ringelaier Leite St 2127 2015

Closeup view of the very impressive rock that fell due to rock scaling. Workers were able to successfully remove the rock from the roadway.

Stabilisation des pentes - Ringelaier Leite St 2127 2015

Partial protection with SPIDER®-System.

Stabilisation des pentes - Ringelaier Leite St 2127 2015

Partial protection with TECCO® SYSTEM³.

Stabilisation des pentes - Ringelaier Leite St 2127 2015

Partial protection with SPIDER®-System.

Stabilisation des pentes - Ringelaier Leite St 2127 2015

Detailed view of SPIDER®-System.

Stabilisation des pentes - Ringelaier Leite St 2127 2015

Excess vegetation must be routinely removed so roots cannot cause increasing amount of pressure and trigger instability in the slope.

 
 

Année d’installation

2015

Situation de départ

Some 50 years ago State Road 2127 was widened to accommodate increased traffic volume. Sections of rock face adjacent to the roadway required scaling. The material that was removed was reused as part of the pavement. Because of the stability of the local rock, no protection measures were required.

As a consequence of being moderately to heavily saturated over the past 20 years, crevices in the rock fragments have expanded, in most parts by over one meter. The crevices bisect the steep rock face nearly vertically and caused several rockfall incidents in 2014.

The Bavarian Agency for Environment decided to install several single-block stabilization systems. Further actions have not been planned due to costs and environmental protection.

Géologie

Quartz / Slate

Description

During rock scaling, those rocks with a volume of up to 6 m³ were removed. Critical sections with reduced stability are now being stabilized with the SPIDER® and TECCO® protection systems.

Client

State Administration Passau

Entrepreneur

HTB Kufstein

Objet protégé

Route/Rue

Protection anticorrosion

GEOBRUGG SUPERCOATING

Ingénierie

IFB Eigenschenk

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail