Suisse
Suisse

myGeobrugg

Stabilisation des pentes - Purple Rock East 2015

View of stabilized slope from the top

Stabilisation des pentes - Purple Rock East 2015

.

Stabilisation des pentes - Purple Rock East 2015

Drilling works on the top slope

Stabilisation des pentes - Purple Rock East 2015

Installation of TECCO SYSTEM with telescopic crane

 

Systèmes

 

Année d’installation

2015

Situation de départ

Rock slope with risk of rockfall due to fractured and weathered rock mass.

Description

Slope stabilization with TECCO System (G65-3)and anchors of D32 mm every 2 meters.

Client

Autoridad del Canal de Panamá - ACP

Entrepreneur

Alvarado & Düring International

Protection anticorrosion

GEOBRUGG SUPERCOATING

Ingénierie

Autoridad del Canal de Panamá - ACP

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail