Suisse
Suisse

myGeobrugg

Stabilisation des pentes - Planta Hidroeléctrica Mendre 1 2016

Overview of block stabilization with SPIDER® System

Stabilisation des pentes - Planta Hidroeléctrica Mendre 1 2016

Installation of SPIDER® System just directly next to the pressure pipes

Stabilisation des pentes - Planta Hidroeléctrica Mendre 1 2016

Insertion fo the Gewi bars into the borehole before grouting - for the installation crew's safety all the drilling works were executed with the already hanging SPIDER® S3-130 net

Stabilisation des pentes - Planta Hidroeléctrica Mendre 1 2016

Unstable basalt blocks directly next to the hydropower plant's pressure pipes were stabilized using SPIDER® System

 
 

Année d’installation

2016

Situation de départ

At the cut where the pressure pipe descends to the Mendre I hydroelectric plant, a block of rock threated the power plant.

Géologie

Basalts.

Description

Geobrugg specialists used the RUVOLUM software for the design and applied SPIDER® System to stabilize the blocks around the pipeline. Rock nails GEWI 28 mm were used to fix the net.

Client

Caldera Energy Corp.

Entrepreneur

IDM Ingenieria y Construcción S.A.

Objet protégé

Infrastructure

Protection anticorrosion

GEOBRUGG SUPERCOATING

Ingénierie

Geobrugg AG

Autres sociétés participantes

Nómadas de Centroamérica S.A.

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail