myGeobrugg
2018
The wall above the concrete mixer showed signs of deterioration.
After a structural analysis: Steel cables and DELTAX® 80/2 mesh support the wall and transfer the forces to the ground through spiral rope anchors placed on the slopes lateral to the wall.
Panama
Concretos Emperador S.A.
IDM Ingeniería y Construcción S.A.
IDM Ingeniería y Construcción S.A.
NDC
Bâtiment, Infrastructure, Autres
GEOBRUGG SUPERCOATING, INOX 1.4462 (AISI 318)