Suisse
Suisse

myGeobrugg

Protection contre les chutes de pierres - Klokova Mountain, National Road 5 (EO5) 2015

Perfect view of the national road protected with the GBE-3000A rockfall barrier

Protection contre les chutes de pierres - Klokova Mountain, National Road 5 (EO5) 2015

Installed GBE-100A-R rockfall barrier

Protection contre les chutes de pierres - Klokova Mountain, National Road 5 (EO5) 2015

GBE-1000A-R rockfall barrier installed on the concrete retaining wall

Protection contre les chutes de pierres - Klokova Mountain, National Road 5 (EO5) 2015

Installed GBE-2000A rockfall barrier

Protection contre les chutes de pierres - Klokova Mountain, National Road 5 (EO5) 2015

Installed GBE-3000A rockfall barrier. Heavy traffic visible below

Protection contre les chutes de pierres - Klokova Mountain, National Road 5 (EO5) 2015

RXE-5000 rockfall barrier during Installation - visible net pre-assembling

Protection contre les chutes de pierres - Klokova Mountain, National Road 5 (EO5) 2015

RXE-5000 rockfall barrier during installation

Protection contre les chutes de pierres - Klokova Mountain, National Road 5 (EO5) 2015

RXE-8000 rockfall barrier during installation

Protection contre les chutes de pierres - Klokova Mountain, National Road 5 (EO5) 2015

Installed RXE-8000 rockfall barrier

 

Longueur du système

60 m - 385 m

 

Année d’installation

2015

Situation de départ

In order to provide protection to a national road around Klokova Mountain, a rockfall protection system was installed.  Installation allowed the advance drilling, blasting, and construction of a twin bore tunnel system; while minimizing the impact to travel in the area.  National Road (EO5) is the only North-South connection to the mainland, therefore, it is of high importance for the local economy.

Description

Geobrugg took over the responsibility of Contractor for rockfall protection installation.  Other works included:  rock scalling, rock bolting and finally, the installation of a wide range of rockfall barriers, including the GBE and RXE.

Client

TERNA S.A.

Entrepreneur

Geobrugg AG

Objet protégé

Route/Rue

Protection anticorrosion

galvanisé, GEOBRUGG SUPERCOATING

Ingénierie

Freefall Geotechnical Engineering ZTGmbH

Autres sociétés participantes

Crestageo AG

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail