Protection contre les chutes de pierres - Hoover Dam Visitors Center 2020

Installation of the rockfall protection at the Hoover Dam

Protection contre les chutes de pierres - Hoover Dam Visitors Center 2020

DELTAX® mesh is "wrapped" around the boulder

Protection contre les chutes de pierres - Hoover Dam Visitors Center 2020

The boulder covered with mesh

Protection contre les chutes de pierres - Hoover Dam Visitors Center 2020

Rockfall barrier underneath the boulder

Protection contre les chutes de pierres - Hoover Dam Visitors Center 2020

Protected area around the visitors center, the protective installation is visible on top of the picture

 

Systèmes

 

Année d’installation

2020

Situation de départ

Removal of a 16,000 lb rock block

Geovert developed a methode to remove the boulder without any damage to the existing infrastructure located in the fall line directly below the block - escalators, and entrance to the Visitors Center Building.

Description

  • Installation of a temporary GBE-1000A rockfall barrier - 4 meters high (rock face connections on both sides).  
  • A section of DELTAX® mesh was installed over the boulder, the boulder was drilled, and expansive grout was used to downsize the boulder into manageable blocks. 
  • After cracking the boulder with grout, the resulting blocks we scaled into the mesh/barrier in controlled operations. Once in the rockfall barrier, rock and debris were lowered to the ground and removed.  

Entrepreneur

Objet protégé

Infrastructure touristique

Protection anticorrosion

GEOBRUGG SUPERCOATING

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail