Stabilisation des pentes - Franschhoek Pass 2014

Franschhoek Pass slope stabilization showing TECCO® SYSTEM3 and TECMAT® (two kinds of spike plates: P33/40 and P66/50).

Stabilisation des pentes - Franschhoek Pass 2014

Franschhoek Pass slope stabilization showing TECCO® SYSTEM3 and TECMAT® (two kinds of spike plates: P33/40 and P66/50).

Stabilisation des pentes - Franschhoek Pass 2014

Franschhoek Pass slope failure prevention showing TECCO® SYSTEM3 and TECMAT® (two kinds of spike plates: P33/40 and P66/50). Additionally visible drainage of the slope.

 

Année d’installation

2014

Situation de départ

During the latter half of 2013, the region had unseasonably high rainfall which led to several slope instability cases along the route. The majority of instabilities occurred as rock falls and superficial slides. The project was seen as an emergency work to develop a timely solution to the problem to ensure the pass could remain open to traffic while not compromising safety. Furthermore, in keeping with the heritage of the route and the surrounding environment, aesthetically pleasing and environmentally friendly solutions were required.

Géologie

Sedimentary rocks, highly folded. It falls under the Malmesbury Group of rocks and consists of pale-weathering massive quartzites, subgreywacke, conglomerate, dark slate and phyllite. The soil consists of 18-24% clay. The site consists predominantly ML (acc. USCS) materials.

Description

A key feature of the solution was to significantly improve surface and underground drainage. Geobrugg's RUVOLUM® software was used to ensure the correct system materials/products were chosen and that these effectively integrated with the overall geotechnical solution. A combination of TECCO® System and TECMAT® erosion control material was used to cover the area.

Client

Western Cape Deptartment of Transport and Public Works

Entrepreneur

Penny Farthing

Objet protégé

Route/Rue

Protection anticorrosion

GEOBRUGG SUPERCOATING

Ingénierie

SMEC South Africa

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail