Suisse
Suisse

myGeobrugg

Stabilisation des pentes - Fierza Hydroelectric Power Station #3 2014

Slope protected with TECCO® G65/3 mesh and TECMAT®.

Stabilisation des pentes - Fierza Hydroelectric Power Station #3 2014

Drilling work and nail installation.

Stabilisation des pentes - Fierza Hydroelectric Power Station #3 2014

Drilling work and nails installation completed with a "Spider" machine.

Stabilisation des pentes - Fierza Hydroelectric Power Station #3 2014

Installation using a drilling machine always requires a two-man crew.

Stabilisation des pentes - Fierza Hydroelectric Power Station #3 2014

Slope protected with TECCO® G65/3 mesh and TECMAT®.

Stabilisation des pentes - Fierza Hydroelectric Power Station #3 2014

TECCO® G65/3 high-tensile steel mesh is very light weight, allowing helicopter installation.

 

Année d’installation

2014

Situation de départ

Slope instability on the lake sides had to be stabilized.

Description

Slope stabilization with TECCO® System with TECCO® G65/3 mesh with TECMAT® for erosion control.

Stabilization of single boulder with SPIDER® S4-230 net.

Client

KESH Albania

Entrepreneur

Cresta Geo Switzerland

Objet protégé

Route/Rue, Bâtiment

Protection anticorrosion

GEOBRUGG SUPERCOATING

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail