Suisse
Suisse

myGeobrugg

Laves torrentielles et coulées de boue - Fierza Hydroelectric Power Station #2 2014

Installed SL-150 shallow landslide barrier.

Laves torrentielles et coulées de boue - Fierza Hydroelectric Power Station #2 2014

Installation of post and ropes with brake rings.

Laves torrentielles et coulées de boue - Fierza Hydroelectric Power Station #2 2014

Installation of SPIDER® high-tensile steel mesh on the barrier.

Laves torrentielles et coulées de boue - Fierza Hydroelectric Power Station #2 2014

Finished SL-150 shallow landslide barrier.

 

Systèmes

 

Longueur du système

40 m - 75 m

 

Année d’installation

2014

Situation de départ

Shallow landslides were slipping into the lake and surrounding road.

Description

Landslide protection with shallow landslide barriers SL-150.

Pays / Région

Albanie

Client

KESH Albania

Ingénierie

-

Entrepreneur

Cresta Geo Switzerland

Autres sociétés participantes

-

Objet protégé

Route/Rue, Bâtiment

Protection anticorrosion

galvanisé

Votre contact local

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Olivia Sartorius
   

Olivia Sartorius

Country Manager Eastern and Central Switzerland

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG Country Manager Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Système de surveillance d'ouvrage à distance
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Country Manager Southern Switzerland

E-mail