Stabilisation des pentes - DB SoFo Kestert 2021

After the rockfall, the area was stabilized with mesh

Stabilisation des pentes - DB SoFo Kestert 2021

After the 15'000 tons rockfall event

Stabilisation des pentes - DB SoFo Kestert 2021

6'500 square meters were stabilized

Stabilisation des pentes - DB SoFo Kestert 2021

Upper line of the netting

 

Année d’installation

2021

Situation de départ

In March 2021, a rockfall of around 15,000 tons occurred near Kestert. The track and the road underneath had to be closed.

Description

After scaling and clearing works, the protective netting was installed. The nailings are between six and twelve meters long. Other at-risk sections were secured with SPIDER S3-130 and SPIDER S4-130.

Client

Entrepreneur

Feldhaus Bergbau GmbH & Co. KG, Karl-Heinz Schneider Baugeschäft GmbH, Schönberger Bau GmbH & Co. KG

Objet protégé

Route/Rue, Chemin de fer

Protection anticorrosion

GEOBRUGG SUPERCOATING

Ingénierie

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail