Protection contre les chutes de pierres - Bulli Pass (1) 2017

A 1,1 km long Shallow Landslide Barrier protects the road at Bulli Pass in New South Wales.

Protection contre les chutes de pierres - Bulli Pass (1) 2017

Placing concrete for post footings ©NSW Government

Protection contre les chutes de pierres - Bulli Pass (1) 2017

Overview of work site ©NSW Government

Protection contre les chutes de pierres - Bulli Pass (1) 2017

Site preparation ©NSW Government

Protection contre les chutes de pierres - Bulli Pass (1) 2017

Installation of barrier mesh fencing ©NSW Government

Protection contre les chutes de pierres - Bulli Pass (1) 2017

Work near satefy ramp ©NSW Government

Protection contre les chutes de pierres - Bulli Pass (1) 2017

Installed posts and footings ©NSW Government

Protection contre les chutes de pierres - Bulli Pass (1) 2017

Cranes lifting rock fall protection barrier components into position above Bulli Pass ©NSW Government

Protection contre les chutes de pierres - Bulli Pass (1) 2017

Precast concrete pad footings for the rockfall protection barrier posts ©NSW Government

Protection contre les chutes de pierres - Bulli Pass (1) 2017

Rear side of the barrier with brakes

 

Longueur du système

1100 m

 

Année d’installation

2017

Situation de départ

The Wollongong Escarpment Area in Wollongong New South Wales is unstable and Bulli Pass is subject to rockslides especially in times of heavy rainfall. Bulli Pass has a history of slip and rock fall events. A major slip in 2008 required slope stabilisation works with the road being closed for seven weeks. Following several events, including a serious rock fall that landed on a vehicle in 2015, there have been extensive investigations into the upslope section of Bulli Pass.  After detailed analysis Geobrugg Australia was chosen as the preferred supplier of a Rock Fall and Landslide mitigation system.

Description

The project reduces the residual slope risk profile from landslide and rock fall events. The project consisted of a 1.1 km of SL-150 Shallow Landslide Barrier and a combination of VX and UX Shallow Landslide Barriers.  The system now provides rock fall and landslide protection from a road that has 12000 car movements a day.  The barrier is 3,5 m high including over 1000 rock nail anchors constructed in difficult terrain. The Barrier is also capable of containing a 500 kg rock travelling at 160 km/hour.

More information:

- Roads & Maritime, New South Wales

Client

Roads and Maritime Authority, New South Wales

Entrepreneur

Specialised Geo Pty Ltd (GHD Contractor)

Objet protégé

Route/Rue

Protection anticorrosion

GEOBRUGG ULTRACOATING

Ingénierie

Department of Public Works, (Project Management)

Autres sociétés participantes

Consultant Andrew Hunter Coffey/GHD (Geotechnical Consultant); Consultant Philip Flentje (University of Wollongong)

Autres applications installées

Protection contre les glissements de terrain et les laves torrentielles

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail