Suisse
Suisse

Borusan EnBW

Ispir Erzurum, Turquie
2019
Client
Borusan EnBW
Ingénierie
Geobrugg AG
Entrepreneur
Artusa Geohazard
Objet protégé
Autres
Hauteur du système
6.0 m
Longueur du système
15 m
Protection anticorrosion
GEOBRUGG SUPERCOATING®
Nombre de barrières
1
Capacité de rétention
3000 m³
Situation de départ

At the hydro power plant infrastructure in 2011 and 2017 torrents brought down debris and clogged culverts of the draining system.  Around 5'000 m³ of debris damaged the HPP area.

Description

At the ideal place for this debris flow barrier, there also is an area for debris material nearby. The system is a V-shaped, 6 meters high barrier (VX160-H6) with 8 meters deep wire rope anchors.

Votre contact local

Roger Moor
Roger Moor
Ost- und Zentralschweiz, Liechtenstein - Country Manager
Natural Hazards, Exploitation minière / Tunnel
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Suisse
René Müller
René Müller
Country Manager Western Switzerland (AG, BE, BL, BS, FR, GE, JU, NE, SO, VD, VS)
Natural Hazards, Exploitation minière / Tunnel
Geobrugg AG
Industriestrasse 21
5200 Brugg / Suisse
Isacco Toffoletto
Isacco Toffoletto
Country Manager Southern Switzerland (TI)
Natural Hazards, Exploitation minière / Tunnel
Geobrugg AG
Via Pizzante 7
6595 Riazzino / Suisse
Jonas von Wartburg
Jonas von Wartburg
Country Manager Western Switzerland/Scandinavia
Natural Hazards, Exploitation minière / Tunnel
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Suisse