Etats-Unis
Etats-Unis

myGeobrugg

 - Blast Protection Mesh 2005

.

 - Blast Protection Mesh 2005

.

 - Blast Protection Mesh 2005

.

 

Année d’installation

2005

Situation de départ

-

Description

Explosion protection for the chemical industry. Problem: Producing a substance from several components is a delicate process that can result in overloads. The bursting of a production installation is protected by a concrete tower open at the top, which resists the detonation pressure and directs it upwards. The opening must also protect against flying debris. Special requirements: Protection against flying debris from the burst installation must be strong enough to retain it but at the same time open enough to allow the detonation pressure to escape. Geobrugg’s answer: A steel frame cage with combined SATURN/ ROMBO mesh, placed over the frame structure is sufficiently permeable to the detonation pressure but strong enough to stop debris flying at a very high velocity.

Client

DSM Linz

Ingénierie

Geobrugg Security Engineering

Votre contact local

Ivo Naef
 

Ivo Naef

Sales Manager Safety Solutions

Impact Protection
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Sales Manager Safety Solutions

E-mail