Suisse
Suisse

myGeobrugg

Stabilisation des pentes - Beaminster Tunnel & Slopes 2013

One side of the tunnel after tragic landslide

Stabilisation des pentes - Beaminster Tunnel & Slopes 2013

Another side of the tunnel after tragic landslide

Stabilisation des pentes - Beaminster Tunnel & Slopes 2013

One of tunnel portals slopes during soli nailing works

Stabilisation des pentes - Beaminster Tunnel & Slopes 2013

Drilling works using drill rig installed on an excavator arm

Stabilisation des pentes - Beaminster Tunnel & Slopes 2013

Tunnel portal towards the end of installation

Stabilisation des pentes - Beaminster Tunnel & Slopes 2013

800 TECCO® SYSTEM³ spikes plates were used

Stabilisation des pentes - Beaminster Tunnel & Slopes 2013

A total of 4700 m² was stabilised with TECCO® G65/3

 

Systèmes

 

Année d’installation

2013

Situation de départ

In 2012 following a period of havy rainfall a landslide blocked the road tunnel portal (also known as Horn Hill Tunnel), killing two people.

Géologie

Sands.

Description

Parson Brinckerhoff used the knowledge of Geobrugg to design a soil nailed solution. In total 4700 m² of TECCO® G65/3 and 800 system spike plates were used to complete the project. TECCO® Sistem was selected as it provided the option of optimisation of nail spacing which on a projecrt of this scale allowed for significant cost and time savings.

Client

Dorset County Council

Entrepreneur

Raymond Brown Construction Ltd.

Objet protégé

Route/Rue

Protection anticorrosion

GEOBRUGG SUPERCOATING

Ingénierie

Parsons Brinckerhoff

Autres sociétés participantes

CAN Geotechnical Ltd.

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail