스위스
스위스

myGeobrugg

Imogiri Royal Cemetery, Yogyakarta

비탈면 보강 시스템 - Imogiri Royal Cemetery, Yogyakarta 2020

A few weeks after installation, in January 2021, the stabilizing mesh has become invisible, the slope looks natural - protection of the local villagers and go-green aspect.

비탈면 보강 시스템 - Imogiri Royal Cemetery, Yogyakarta 2020

Initial condition of the slope, before clearing

비탈면 보강 시스템 - Imogiri Royal Cemetery, Yogyakarta 2020

The Sugengan, a traditional Royal Yogyakarta ceremony for initiating the project

비탈면 보강 시스템 - Imogiri Royal Cemetery, Yogyakarta 2020

The slope after clearing

비탈면 보강 시스템 - Imogiri Royal Cemetery, Yogyakarta 2020

Drilling soil nails

비탈면 보강 시스템 - Imogiri Royal Cemetery, Yogyakarta 2020

Drilling soil nails

비탈면 보강 시스템 - Imogiri Royal Cemetery, Yogyakarta 2020

Grouting

비탈면 보강 시스템 - Imogiri Royal Cemetery, Yogyakarta 2020

Installation of the mesh rolls - they do roll!

비탈면 보강 시스템 - Imogiri Royal Cemetery, Yogyakarta 2020

Installation of the spike plates and tightening the nuts using a torque wrench

비탈면 보강 시스템 - Imogiri Royal Cemetery, Yogyakarta 2020

Completed installation in December 2020; re-vegetation has already started

비탈면 보강 시스템 - Imogiri Royal Cemetery, Yogyakarta 2020

The stabilized slope end of February with a very natural look.

 

Systems

 

Year of installation

2020

Situation

On the north slope of Imogiri hill, a considerable risk potential had to be faced. Slope failures can cause damages to the Imogiri Royal Cemetery on the top of the hill. Also, they threaten villagers who live and work at the hill’s toe.

Geology

Weathered rock and andesite

Description

For stabilization system with steel wire mesh was installed to stabilize the slope. The system is proven, efficient, and reliable. It has little visible impact and respects ecological aspects.

Customer

Kraton Yogyakarta

Contractor

PT. Triputri Sukses Mandiri

Protected object

Building, Infrastructure, Art

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

PT. Tri Patra Konsultan (designer), PT. Cipta Adi Tama (supervisor)

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail