The revision works at the railway line no. M202 Zagreb-Rijeka were done together with the installation of a slope protection system. In the past, regularly occurring rock falls limited the speed of the trains.
Limestones covered by scree
When designer Vanja Kovačević received data from the geologist, he chose TECCO® G65/4 for this slope protection. TECCO® G65/4 was combined with 4 meters long self-drilling nails (32/21 mm) and 6 to 14 meters long nails (51/34.3 mm).
This is the first TECCO® G65/4 installation in Croatia.
Croatian Railway
Swietelsky d.o.o. Zagreb
Ferrocarril
GEOBRUGG SUPERCOATING
Elektroprojekt d.d. Zagreb (Krešo Ivandić and Vanja Kovačević)
Octopus-Rijeka d.o.o. Rijeka