Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024

Protección contra caídas de rocas - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Tidong power plant with protection installations from the distance

Protección contra caídas de rocas - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Drilling operation at site

Protección contra caídas de rocas - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Challenging site condition - works exactly above the powerhouse

Protección contra caídas de rocas - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Installation of DELTAX® protective mesh

Protección contra caídas de rocas - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Installation of DELTAX® and QUAROX® protective mesh

Protección contra caídas de rocas - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Installation of the ringnet rockfall barrier, which, together with the mesh, protects the infrastructure.

Protección contra caídas de rocas - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

Installation of RXE-500 rockfall barrier

Protección contra caídas de rocas - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

30 meters of 500 kJ rockfall barrier installed to protect SST-UAT area

Protección contra caídas de rocas - Tidong-I Unit 3 Hydro Electric, Himachal Pradesh, 2024 2024

RXE rockfall protection barriers offer maximum safety in the tightest of spaces

 

Longitud del sistema

30 m

 

Año de instalación

2024

Situación inicial

The project location in Himachal Pradesh, India, lies approximately 40 kilometers east of Kalpa. In 2019, the powerhouse below the cliff was still under construction. By 2024, however, it was fully operational, with sophisticated equipment installed within and on top. Ensuring the prevention of rockfalls during slope stabilization work was critical, as the area was narrower compared to previous work. Dead trees on the vertical edges of the cliff added to the project’s complexity, requiring careful negotiation. Design and technological modifications were necessary at every step. Rockfalls have been observed in the SST-UAT area of the powerhouse, prompting the customer to request a barrier solution for this specific location.

Descripción

The site required a cost-effective protection system to stabilize the problematic slope and safeguard the powerhouse area permanently. The chosen solution needed to address several challenges: an almost vertically unstable slope with limited accessibility, complex geological conditions, and strict installation time constraints. The client entrusted us with the full responsibility for designing, supplying, and installing the solution.

The client relied on the previously installed flexible slope stabilization system, which utilized QUAROX® 0.3/6.5/275 rolled cable net with Geobrugg SUPERCOATING and high tensile rockfall protection netting DELTAX® G80/2 (secondary mesh)—total area 3500 square meters.  The installation included a variable grid pattern and fully grouted rock bolts with a diameter of 32 mm and a length of 3 meters.

Additionally, an RXE-500 rockfall barrier line of 30 meters, with a post height of 4 metes capable of absorbing impact energies up to 500 kJ, was installed in the SST-UAT area to protect both men and machinery. 

País / Región

India

Cliente

Statkraft

Objeto protegido

Infraestructura

Protección contra la corrosión

Galvanizado

Su contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suiza Country Manager Western Switzerland

Correo electrónico

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG Project Manager Sales Eastern Switzerland

Correo electrónico

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Protección contra riesgos naturales
Sistema de supervisión remota
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Suiza Project Manager Inspection Services

Correo electrónico

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suiza Country Manager Southern Switzerland

Correo electrónico